How to Move Offices Without Disrupting Your IT
When a business decides to move offices, the furniture and boxes get the attention. But what decides whether Monday morning goes smoothly is the internet connection, the network, the phones and the computers. These are the things that take the longest to arrange and the most to fix when they are wrong. Plan the IT first.
Involve your IT provider before the move date is set
The date should depend on the technology, not the other way round. Internet service can take weeks to install in a new location, and equipment can take time to arrive. Tell your IT provider as soon as you are considering a move, so they can check the new space and tell you what it needs before you commit to a date.
Give one person responsibility when you move offices
Someone in your business should own the IT checklist and be the contact for your provider, your internet company, your phone company and the landlord. Without one person, tasks fall between people. They do not need to be technical, only organized.
List what your business needs in order to operate
Write down everything the team uses on a normal day: computers, printers and scanners, servers, phones, payment terminals, a door entry system or alarm, cameras, specialized equipment and the software behind them. Note which are essential on day one and which can wait. This becomes your move plan and your checklist for testing.
Check the new office properly
Walk the space with your IT provider before you sign or move in. Look at:
- Power: enough outlets, where they are, and whether critical equipment needs a backup battery.
- Cabling: whether network cables exist, where they end and what condition they are in.
- Space for equipment: a place for the router, switches and any server, with ventilation and a lock.
- Wi-Fi coverage: walls and layout affect it, so plan where access points will go.
- Building rules: who controls the telecom room, riser and roof access, and what the landlord must approve.
Arrange the internet connection early
Order it as soon as you know the address, since installation dates can be weeks away and may depend on the building. Ask what speed and type are available, whether there is more than one provider, and the installation date. If an outage would hurt, consider a second connection as a backup. Keep the old connection active until you confirm the new one works.
Check phones, alarms and other communication lines
Phones, fax lines, alarms, elevators, door entry and card readers can depend on specific lines or services. Find out what each needs, whether it can be moved and when your provider can switch it. Tell customers your new phone number in advance if it will change, and plan call forwarding for the transition.
Plan the network for the new space
A move is the best time to improve your setup, not just copy it. Plan a network sized for your people and devices, good Wi-Fi coverage, a guest network separate from the business network and a firewall suited to your size. See our post on guest Wi-Fi. Buy and configure equipment ahead of time, so it is ready when you arrive.
Back up important systems before equipment is moved
Moving equipment is one of the most common ways to lose data: a dropped drive, a server that does not come back up, a missing cable. Before the move, confirm that backups are current and that you can restore them, and keep a copy off site. See backup and disaster recovery.
Plan move day
- Label every device and cable, and photograph the setup before you take it apart.
- Shut down equipment properly and pack it carefully, especially servers and drives.
- Move critical items yourselves or with trusted movers, not with general furniture.
- Reconnect in the order your plan says, with your IT provider on site or on call.
- Test each essential item against your checklist before you leave: internet, Wi-Fi, printing, phones, shared files, payment terminals and the alarm.
After the move
Fix the small problems quickly: a printer that will not connect, a slow room, a missing outlet. Update your business address everywhere, including your website, email signatures, Google Business Profile, invoices, insurance and any systems with fixed IP addresses or location settings. Keep the old connection and equipment until you are sure everything works, then cancel services you no longer need and securely wipe equipment you are disposing of.
A short timeline
- Two to three months before: tell your IT provider, check the new space, order internet.
- One month before: plan the network, order equipment, arrange phones and alarms.
- Two weeks before: confirm install dates, back up, write the move plan.
- Move week: back up again, move, test everything on the checklist.
- After: fix issues, update addresses, cancel old services.
Where we can help
Our consulting services include network design for a new location, and we can come to your location to test your connections and Wi-Fi. Our managed IT services cover hardware and software support, and emergency support is available 24/7. Contact us early in your planning, or start with a free network review of your current setup.
Frequently asked questions
How far ahead should we plan the IT for an office move?
As early as you can, ideally two to three months. Internet installation and equipment orders can take weeks, and the answers affect your move date.
How long does it take to get internet at a new office?
It varies by location and provider, and can take several weeks. Ask for the installation date as soon as you know the address.
Should we keep the old connection running?
Yes, until the new one is confirmed working. Then cancel it, so you are not paying for two.
What is the biggest risk on move day?
Losing or damaging data and equipment, and finding that something essential does not work. A recent tested backup and a checklist for testing address both.
Can we take the move as a chance to improve our network?
Yes. It is the easiest time to fix Wi-Fi coverage, add a guest network, upgrade the firewall and replace old equipment, since you are installing everything anyway.